This project includes a cast in place Wet Well with Screening Facility, 280 HP Submersible Pumps, Electrical and Control Systems, and a Standby Diesel Generator. This facility is capable of pumping in excess of 92,000 GPM or 205 CFS. This project also includes a cast in place Out Fall Structure located at the San Joaquin River.