Constructed to provide an aesthetically pleasing view from the road, the Water Treatment Plant project included the equipping of the Well, Masonry Well/Control Building, Horizontal Pressure Filter System, Backwash Storage Tank, Bathroom Building, Emergency Backup Power System, Electrical Control System, and Site Architectural Fencing System.