This project involves the development of a potable water well site designed to supply over 900 gallons per minute (GPM) of potable water to the City of Patterson.

Key features of the project include:

  • Well Drilling for a high-capacity municipal water supply.
  • Installation of a Vertical Turbine Well Pump for efficient water extraction.
  • A Standby Diesel Generator to ensure uninterrupted operation during power outages.
  • Construction of an Architectural Block Building to house the well pump and associated infrastructure.
  • Integration of a Chemical Feed System for water treatment and quality control.
  • Installation of all necessary Electrical and Control Equipment to manage and monitor well operations.

This infrastructure will significantly enhance the City's water supply capacity, supporting current and future demands for safe, reliable drinking water.