The Arambel Tank and Booster Station project, recently initiated, will significantly enhance the City of Patterson’s potable water storage and distribution capabilities.
Key components of the project include:
- A 1.5 million-gallon (MG) steel water reservoir, measuring 90 feet in diameter, to provide substantial storage capacity.
- A booster pump station housed within an architectural masonry block building, designed for durability and aesthetic integration.
- Installation of four (4) canned vertical turbine booster pumps to ensure high-capacity water distribution.
- A hydropneumatic tank to regulate system pressure and support consistent water flow.
- A standby diesel generator to maintain uninterrupted operations during power outages.
- Complete electrical and control systems for reliable, automated operation and system monitoring.
Once completed, this facility will play a vital role in strengthening the City’s water infrastructure, supporting both current demand and future development.






Full Fusion